• Introducing AriesPlus: The Next Generation of Touch Screen Temperature Controllers from Carbolite

Temperature control and sterilising

Introducing AriesPlus: The Next Generation of Touch Screen Temperature Controllers from Carbolite

In the fast-evolving world of laboratory and industrial heating applications, precise control and ease of use are paramount. Carbolite’s new AriesPlus touch screen temperature controllers set a new benchmark for performance, reliability, and user experience. Built with advanced technology and intuitive design, AriesPlus delivers the ultimate in easy, precise, and intelligent temperature control.

Advanced Programmable Control

At the heart of AriesPlus lies its powerful programmable control capabilities. Each controller allows users to set up to 99 segments per program, which can be configured as ramp, step, or dwell, and can also control relay operations. With the ability to store and retrieve up to 50 unique program profiles, AriesPlus enables seamless management of complex processes and repeatable protocols.

Intuitive Touch Screen Interface

Featuring a vibrant 7.0’’ colour capacitive touch screen, the AriesPlus series gives users intuitive access to a comprehensive menu for program selection, editing, and scheduling. Programs can be scheduled to start at a specific day and time, and all settings are easily accessible, including localization in nine different languages. The live process graph display provides real-time feedback, enhancing process transparency and decision-making.

Comprehensive Data Logging and Remote Access

AriesPlus is equipped with robust data-logging features. Temperature setpoints and actual values are securely stored in internal memory, with the option to download data via a convenient front-panel USB port or across a network using the standard Ethernet connection. Remote monitoring is effortless; simply connect via any browser, with no software installation required.

Enhanced Security and Safety

User level security ensures controlled access, while optional integrated over-temperature protection offers clear alarm indication, essential for unattended operation and safeguarding valuable loads. Additional alarm activation options can trigger functions such as door locking or process accuracy monitoring. Program segment events also allow for automation of external devices, such as gas flow switches or cooling fans.

Superior Performance and Competitive Edge

AriesPlus integrates advanced THERMOTUNE for exceptional precision and temperature stability, as demonstrated in performance comparisons with leading competitors. Its high-quality PID control ensures accurate adherence to ramp rates and setpoint temperatures, making it a top choice for laboratories and industrial environments alike.

Experience the Difference

With its comprehensive features, advanced control capabilities, and user-friendly interface, AriesPlus redefines what you can expect from a temperature controller. 

Discover the difference AriesPlus can make for your laboratory or industrial heating applications where easy operation, precision, and control are always at your fingertips - request a personalized demo with one of our experts here.


Digital Edition

Lab Asia Dec 2025

December 2025

Chromatography Articles- Cutting-edge sample preparation tools help laboratories to stay ahead of the curveMass Spectrometry & Spectroscopy Articles- Unlocking the complexity of metabolomics: Pushi...

View all digital editions

Events

Smart Factory Expo 2026

Jan 21 2026 Tokyo, Japan

Nano Tech 2026

Jan 28 2026 Tokyo, Japan

Medical Fair India 2026

Jan 29 2026 New Delhi, India

SLAS 2026

Feb 07 2026 Boston, MA, USA

Asia Pharma Expo/Asia Lab Expo

Feb 12 2026 Dhaka, Bangladesh

View all events