Laboratory Products
New Biological Storage and Manufacturing Facility
Oct 30 2008
Vindon Scientific Ltd have recently relocated to the strategically sited Kingsway Business Park, Rochdale. The Park is a fantastic location for Vindon as it’s right on the motorway link, immediately adjacent to the M62 and Rochdale is an excellent catchment area for recruitment. This new storage and manufacturing facility, which was designed and fitted out to the company’s own demanding specification, will provide the platform for the company to pursue its strategy for growth, whilst also enabling it to continue to grow its existing client base. Vindon’s new headquarters boast 2,738 square metres of office and storage space, and includes a further 2,000 square metres of storage space on its purpose designed mezzanine floors, thus enabling the company to consolidate all of its UK operations into the one site at Kingsway. The move will vastly increase its manufacturing capability. Vindon also offers customers the option of storing materials under environmentally controlled ICH and non-ICH conditions in its purpose designed stability suite. This unique service provides an extremely cost effective solution for controlled environmental storage of materials at temperatures ranging from -150ºC to +55ºC and humidity’s from 10% RH to 95% RH.
Vindon’s Stability Storage Suite can accommodate up to 20,000 cubic metres of product. Walk-in rooms and chambers are always available and additional chambers are available which can be customised and validated for specific customer requirements. All Stability Storage chambers are temperature and humidity mapped and operate independently, with separate real time temperature and humidity controls (where applicable). The rooms are monitored by a computer controlled logging system, which is linked to the company’s intranet so that alarms are recorded immediately. Vindon’s move to Kingsway will enable the company to offer a -86ºC Ultra Low Temperature storage facility for the preservation of biological materials. In addition, the facility will accommodate a number of storage facilities including a high-tech laboratory for stem cell storage. Vindon’s secure low temperature and ultra low temperature storage facility for samples and laboratory research material are designed to provide for a single box of samples all the way through to complete research projects - up to any volume. Vindon were officially welcomed to Rochdale by Councillor Robin Parker, Mayor of Rochdale, on Monday 8th September 2008.
Digital Edition
Lab Asia 31.6 Dec 2024
December 2024
Chromatography Articles - Sustainable chromatography: Embracing software for greener methods Mass Spectrometry & Spectroscopy Articles - Solving industry challenges for phosphorus containi...
View all digital editions
Events
Nov 27 2024 Istanbul, Turkey
Jan 22 2025 Tokyo, Japan
Jan 22 2025 Birmingham, UK
Jan 25 2025 San Diego, CA, USA
Jan 27 2025 Dubai, UAE